Start Date: 2006
Construction Completed
Architect: Antinozzi Associates
Employer: Aschettino Associates
Project consisted of two new buildings plus and addition to an existing building. The addition uses a steel lateral brace framing system with a non-load bearing masonry façade. The other structures also employed a steel lateral brace framing system but use metal studs for the exterior walls.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment